Low price for A106 A179 A192 A210 T1 T5 T9 T11 P5 P9 Seamless Steel Condenser Pipe/Tube
With our leading technology at the same time as our spirit of innovation,mutual cooperation, benefits and growth, we’re going to build a prosperous future together with your esteemed firm for Low price for A106 A179 A192 A210 T1 T5 T9 T11 P5 P9 Seamless Steel Condenser Pipe/Tube, We can do your custom-made get to fulfill your own satisfactory! Our company sets up several departments, including output department, revenue department, excellent control department and sevice center, etc.
With our leading technology at the same time as our spirit of innovation,mutual cooperation, benefits and growth, we’re going to build a prosperous future together with your esteemed firm for China Heat Exchanger Tube and Steel Tube for Heat Exchanger, With the technology as the core, develop and produce high-quality goods according to the diverse needs of the market. With this concept,the company will continue to develop products with high added values and continuously improve solutions,and will give many customers with the best solutions and services!
Brief Introduction
The phosphated steel pipe for hydraulic pressure produced according to DIN 2391 or en10305 has a black and bright color, uniform color and good rust prevention function. Phosphated steel pipes are widely used in hydraulic systems, construction machinery and construction vehicles. It is the main export product of our company.
Phosphated hydraulic Seamless Steel Tube Advantages
- Outside and inside are both phosphated
- Good surface
- Good performance in Anti Rust and corrosion
- Widely used in Hydraulic Systerm
Technical Parameters
Grade | ST35/E235 ST37.4 ST45/E255 ST52/E355 |
Standard | DIN2391 DIN1630 EN10305 DIN2445 JIS G3445 SAE J524 |
Delivery Conditon | NBK(+N) BK(+C) GBK(+A) BKW(+LC) BKS(+SR) |
Length | 6m or as Customers’request |
Tolerance | Outer Diameter: According to Standard |
Thickness: According to Standard | |
Finish | Phosphated Coating |
Oil dipped | |
Application | Hydraulic System;Car/bus;construction vehicle |
Delivery time | A.7 days if this goods is stock goods. |
B.20 days if this goods will be produced after order |
Delivery Condition
Designation | Symbol | Description |
Cold finished (hard) | BK(+C) | Tubes do not undergo heat treatment following the final cold forming and, thus, have a rather high resistance to deformation |
Cold finished (Soft) | BKW (+LC) |
The final heat treatment is followed by cold drawing involving limited deformation. Appropriate further processing allows a certain degree of cold forming (e.g. bending, expanding) |
Cold finished and stress-relieved | BKS(+SR) | Heat treatment is applied following the last cold forming process. Subject to appropriate processing conditions, the increase in the residual stresses involved enables both forming and machining to a certain degree. |
Annealed | GBK(+A) | The last Cold forming process is followed by annealing in a controlled atmosphere. |
Normalized | NBK(+N) | The last cold forming process is followed by annealing above the upper transformation point in a controlled atmosphere. |
Certificates: According to EN 10204 3.1
Inspection Items:
Tensile stength, Yield stength, Elongation, Flattenging, Flaring;
Chemical analysis
Eddy Current Test 100%, Size and surface checking 100%
Other test item can be arranged by A Third Party as per request